Build on your Own Land

by Joe Hurd

exec-63a09d76-717d-44d3-9ad8-2588aa60b86e

Building on Your Own Land · Blog

Building a House on Your Own Land in New Braunfels The Lot Checks, County Permits, and Costs Before You Sign Anything

By Joe Hurd · 830.580.3667 · buyfromjoehurd.com

Should you build on your lot or buy a finished home?

  Build on your own lot Buy a finished new-construction home
Wins when You already own land, or you want acreage and privacy, and you can absorb site costs and a longer timeline You want a known monthly number, a finished lot, and a move-in date
Biggest risk Site costs you didn't see coming, on dirt you already paid for HOA dues that don't end, less land, and you pick from the builder's plan menu
Who carries the lot risk You, all of it The developer and builder dealt with most of it before you showed up

If your budget has no slack in it, buy a finished home. I mean that. If you have slack and you want the land, keep reading.

The part builders don't headline

You can own land you can't put a house on. Not at any price that makes sense, and sometimes not at all. Rock, soil that fails a septic evaluation, a flood corner, no recorded legal access, a well that goes deep and still comes up dry. Any one of those can turn a great deal on dirt into the most expensive camping spot in Comal County.

When you buy raw land, you carry that risk. The seller already has your money, and the builder only prices the house, so nobody else in that deal is on the hook if the lot turns out to be a dud. Every check below happens before you close for that reason.

The sequence, start to finish

Order matters. Most of the money disasters come from doing step five before step two.

  1. Check the lot before you buy it.
  2. Find out where the wastewater goes (septic or sewer).
  3. Find out where the water comes from (well or provider).
  4. Check floodplain and drainage.
  5. Pick a builder and get the real price in writing.
  6. Line up construction financing.
  7. Pull the permits for your address.

Step 1: Check the lot before you buy it

Get a survey, current or new, so you know the boundaries, the easements, and where a house can actually sit. Then confirm legal access. A dirt road everybody's uncle has driven for years is not the same thing as recorded access, so ask the title company what's on record.

Read the deed restrictions before closing, since some land has rules about house size, materials, or what you can build at all. Find out whether the address is inside New Braunfels city limits, in the extraterritorial area, or out in unincorporated Comal County, because that changes who permits what. Inside city limits, the city handles building permits and septic. Outside city limits, septic goes through Comal County. If you're in the extraterritorial area, ask the city what applies at your address. Then check what utilities actually reach the property line. A power line down the road is a nice view. It isn't service.

Put an option period in the contract so you can run Steps 2 through 4 before your earnest money is at risk. In Texas, you pay the seller an option fee for the right to walk away for any reason within the number of days you negotiate. If you terminate in time, you get your earnest money back and the seller keeps the option fee. If you close, the option fee is credited to the price. Miss the deadline and the right is gone, so put the evaluator and the survey on the calendar the day you sign.

Step 2: Septic is the check that kills lots

If no city sewer line serves the lot, the house needs an on-site septic system, which the state calls an OSSF. In unincorporated Comal County, that permit comes from the Comal County Engineer's Office. Before they issue it, a qualified site evaluator has to do a soil and site evaluation, and that evaluation decides what kind of system the lot can take.

Put the two numbers side by side. The lot looked cheap. Then the site evaluation says the soil needs a more expensive system, and what that costs depends on where you are. Digging through Hill Country rock and digging through farm land south of I-35 are two different jobs with two different bills, so get a quote for your parcel, not a number from a guide. If you already closed, that bill is yours. If the soil fails outright, you own a lot you can't build on, and the seller is at the lake.

Skipping this check is how you end up starring in The Money Pit, except Tom Hanks at least got a house.

Lot size matters too, and the rule depends on where the parcel sits and whether it's on a well or public water. Take the parcel ID to the county's Engineer's Office and ask which septic rule applies before you buy.

Get the site evaluator out during your option period, so if the lot fails, you find out while you can still walk away.

Step 3: Water, either a well or a provider

Some lots can connect to a water provider and some need a well. Being close to a water line doesn't mean you can connect to it, and the provider changes parcel by parcel. The Texas PUC's CCN viewer shows which retail water provider holds the service area for a location, so start there and then get the answer from that provider in writing.

If a provider serves the lot, ask for their current written schedule of connection and impact fees. Don't trust a number you heard at a barbecue. If you need a well, get a quote from a local driller. Rock or farm land, depth drives the price, and nobody knows the depth until somebody drills.

Wells come with district rules too. In Comal Trinity Groundwater Conservation District territory, a domestic or livestock well is exempt from the withdrawal permit. Inside the Edwards Aquifer Authority, exempt wells have to be registered and drilling one needs an EAA permit. Ask the title company or the district which one covers your parcel before you drill.

Step 4: Floodplain and drainage

Pull the FEMA flood map for the parcel at msc.fema.gov before you make an offer. The Comal County Engineer's Office handles floodplain in the county, and new construction goes through a floodplain review there, so the county can decide whether the site sits in the regulatory floodplain. Development in the floodplain needs a permit. FEMA issued new preliminary maps for the county in 2021, so make sure the map you pull is the current effective one.

The map doesn't tell you everything. A lot outside any flood zone can still turn into a pond in a heavy rain. It doesn't rain often in Texas, but when it does, it likes to do it with a bang. Walk the lot and think about it: when we get 8 inches of rain in 4 hours, where is that water going to go? Look at which way the neighbors' ground slopes. Wear boots. If you need waders, you have your answer.

Got a lot in mind and not sure it passes Steps 2 through 4? Grab a time on my calendar and bring the address.

Step 5: Who actually builds on your lot

Production builders with lot programs give you a catalog of plans to build on your land. Coventry has a build-on-your-lot program listed under New Braunfels, with the Premium Series starting at $265,900 for the Kendalia, a 3 bed, 2 bath of about 1,607 square feet (as of this writing). That's the kind of number I mean at the top of this post. It's a real price for a house plan, but it isn't your price, because you still have the lot, the septic or sewer, the water, the driveway and the clearing to pay for. Their Elite line starts higher. Ask whether your lot is in their program area.

Semi-custom builders adapt existing plans. Southwest Homes, for example, says it builds on customer-owned land across the Hill Country and works with lenders on construction-to-perm financing. Full custom is you, a designer, and a builder starting from a blank page, with a price that moves every time somebody says "while we're at it."

Ask every builder the same questions so you can compare them:

  • What does your starting price include, and what is excluded?
  • Who orders the septic and well work, and is it in your contract?
  • Who pulls permits?
  • What is the timeline, and what stops the clock?

For who builds well around here, my New Braunfels Builders Guide goes builder by builder.

Step 6: Financing a build

Lenders look at raw land the way your mom looked at your first tattoo. Land loans often want more cash down and cost more than a regular mortgage, so get a quote from a lender before you count on a number. A construction loan pays the builder in stages as the work gets done.

A construction-to-perm loan is one loan with one closing that converts to a regular mortgage when construction finishes. The loan-to-value is set off the appraised value of the house as completed, so an appraisal on a house that doesn't exist yet carries a lot of weight. Lenders usually review your builder and your contract before they approve the loan, and what they ask for varies. Talk to a lender before you buy the lot, so you don't end up owning land you can't get a build loan on.

Step 7: Permits for your address

The county's permits page says certain permits may be required in unincorporated Comal County, like a septic permit and a floodplain development permit. A driveway that connects to a county road needs a right-of-way permit, a new address goes through the county's address coordinator, and parcels near Camp Bullis fall under outdoor lighting rules in the Dark Skies Zone. Ask the county's Engineer's Office which of these apply to your parcel, and bring the parcel ID. Inside city limits, the city's Building Division handles building permits, so it's a different list.

The surprise costs are the whole game

Put a real number on every site cost before the builder pours anything.

Site cost Quote Source
Septic system $____ Installer quote after the site evaluation
Well or water connection $____ Driller quote, or the provider's written fee schedule
Electric and other hookups $____ Utility quote
Driveway $____ Contractor quote
Clearing and grading, including trees $____ Contractor quote
Septic permit $____ The county's current OSSF fee list
Other permits $____ Engineer's Office or the city

Add it up and set it next to the builder's advertised price. That total is what you compare against a finished house. I won't give you a "typical" total, because nobody can know it before they price your parcel.

Build on your lot or buy a finished new build?

A finished new build, where the builder picked the lot and the plan, has most of the site risk handled before you show up, and the monthly number is easier to predict. The trade is HOA dues that don't go away, a smaller lot, and a plan off the builder's menu. This post is about the other path, a build on land you choose. My Mayfair Buyer Guide and New Construction Guide cover that side, and the New Braunfels market update shows where prices sit right now.

Building on your own land wins when the land is the point: acreage, privacy, room for a shop, or land you already own free and clear. It loses when you stretch to afford the lot and the house and have nothing left for what the dirt turns out to cost.

Want me to walk your lot first?

If you have a lot in mind and haven't closed yet, grab a time on my calendar and let's walk it together before you close. If you don't have a lot yet, my free Central Texas Playbook covers taxes, HOAs, flood zones, and which areas fit different budgets.

So what do you have right now, land you own or a lot you're considering, and what's the number you can't go over for the whole project?

FAQ

Do I need a septic system if I build outside New Braunfels city limits?

Plan on it. If no city sewer line serves the lot, you need an on-site system, permitted through the Comal County Engineer's Office in the unincorporated county, and a soil and site evaluation by a qualified evaluator comes first. Confirm the rules for your parcel with the Engineer's Office.

How much does it cost to drill a well in the Hill Country?

Treat it as one of the biggest site costs on the list. Depth moves the number more than anything, and drilling through rock is a different bill than drilling through farm land, so get a quote from a local driller for your parcel.

Which builders in New Braunfels will build on my own lot?

Plenty will, and none of their starting prices is your final number. Coventry lists a build-on-your-lot program under New Braunfels with the Premium Series starting at $265,900 for a house plan, before the lot and site work. Ask whether your lot is in their program area. Southwest Homes builds on customer-owned land across the Hill Country. My Builders Guide goes into more detail.

How long does it take to build a home on my own land in Comal County?

Longer than buying a finished home. It depends on the builder, the location and the size of the home. My rule of thumb: whatever timeline the builder gives you, add 2 months.

Is it cheaper to build on my land or buy new construction?

Not automatically, and usually not if you're stretching to do it. Price the site costs first, then compare that total plus the build to a finished new-construction price.

Joe Hurd
Joe Hurd

Agent License ID: 766165

+1(830) 580-3667 | joehurdrealtor@gmail.com

GET MORE INFORMATION

Name
Phone*
Message